Leading on from Tom's post (yes, this roundabout design is on the same corridor, it in fact marks the northernmost extent for the improvements, just before the road turns from 30mph to 40mph, go figure http://www.cycling-embassy.org.uk/node/3104) an entire stretch is "up for grabs" - and it seems firmly in the hand of the highway engineers with traffic flow being first in their consideration, whilst only token efforts to cycling are made, and the proposal does not actually hold much for improving walking conditions.
GNR = Great North Road. Funding for improvements comes from direct DfT "traffic smoothing" budget and £1.3m stems from te DfT's Cycle Safety Fund.
It's seven pdf drawings - filesize is laaarge, and download may be slow http://newcycling.org/sites/default/files/All_101-107.pdf
The council drawings (separately) are on the council website. It's also attempt for council to put things into context and give some narrative http://www.newcastle.gov.uk/parking-roads-and-transport/travel-planning/gosforth-transport-major-scheme-funding-bid
An overall plan (part of the traffic order) is here http://newcycling.org/sites/default/files/16.01.14%20Gosforth%20Corridor%20Scheme%20TRO%20plan.pdf
If the Embassy / forum has a view on the designs and layouts, that'd be great. In fact... knock yersel oot. But be warned, I - having had a look - am ready to curl up in the corner to weep. Even just commenting on one junction design would help immensely. Thanks!
Attachment | Size |
---|---|
Traffic order (text) | 127.5 KB |