C05 Monitoring

Publisher: 
Cycling England
Publication date: 
August 2008
Document file: 

Document types:

Document weight:

Document geography:

Geographical spread:

Abstract: 

Local authorities should develop a robust system for monitoring and evaluating cycling activities throughout their area to enable targets to be set for future growth.

Cycle flows should be measured before and after the introduction of all new cycle tracks and lanes and consideration given to developing local targets based on these surveys that can feed into overall cycle–use targets.

Provision for the installation of automatic counters should be included in cycling scheme budgets (including those secured through Section 278 and Section 106 agreements in new-build schemes) to enable a network of data collection points to be established.